← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 10 h ago Notices1 What's new Site map
Next ferry from Tamarind 1 h 6 min · 6:10 PMNext ferry from Seagrape 16 min · 5:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Radcliffe Clean

“Starboard”

Home state set by Shanice, 4 days ago

RS Rep Shanice Delancy Off now, finished 5pm HS Tech Terrence McKenzie Off now, finished 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 5,000 sq ft · 4 beds · lot SP-1 · 6 AC units · Pool, heat pump (electric) Occupied 10 of the last 30 days · 0 this month · 22 this year Limble: Radcliffe - SP-1

🔑 Request access from Shanice

Shanice gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly checkCurrent
2days left
Last Oct 30Due Nov 5
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 368,203 gal · 787 gal/day average, low 46, high 2,941 (30 days) · meter W50017

occupied vacant meter skipped days (use spread evenly)

Average day: 694 gal occupied (10 days) · 834 gal vacant (20 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

62 kWh 62 kWh on Nov 2 (range 60–149 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ Didn’t drop after departure Empty since Oct 26 (8 days) and still 67 kWh a day, 93% of the stay’s 72 kWh. AC or pool heater left on at checkout?
⚡ No setback when empty Last 30 days: empty days average 77 kWh, occupied days 72 kWh (107%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 73 kWh occupied (10 days) · 77 kWh vacant (20 days) · 15.1 kWh a day per 1,000 sq ft

5,000 sq ft · 6 AC units · Pool, heat pump (electric) · occupied 10 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Dec 10 Treated Sep 10, 2026 · next due Dec 10, 2026

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 1 - Main houseCurrent
38days left
Last Sep 12Next Dec 11
AC 2 - Main houseCurrent
66days left
Last Oct 10Next Jan 8
AC 3Current
46days left
Last Sep 20Next Dec 19
AC 4Current
72days left
Last Oct 16Next Jan 14
AC 5Current
37days left
Last Sep 11Next Dec 10
AC 6Current
53days left
Last Sep 27Next Dec 26

Open tickets 1 open in Limble

  • Kitchen GFCI keeps tripping. Reported during the weekly check. #800083 · reported by Shanice Delancy · opened Aug 27, 2026 (68 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design