← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 7 h ago Notices1 What's new Site map
Next ferry from Tamarind 21 min · 2:10 PMNext ferry from Seagrape 1 h 31 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Underwood Dirty Arriving today

“Barefoot Bliss”

Home state set by Keisha, 7 h ago

RS Rep Keisha Thurston Off today (Off) HS Tech Darnell Ferguson On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 4,600 sq ft · 4 beds · lot SP-4 · 5 AC units · Pool, heat pump (electric) Occupied 7 of the last 30 days · 1 this month · 43 this year Limble: Underwood - SP-4

🔑 Request access from Keisha

Keisha gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub
Underwood family (5) arriving Tuesday Nov 3 (today) Arrival check not done (was due Oct 29–Nov 1) · 2 open tickets to clear before arrival · Request housekeeping

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly checkCurrent
7days left
Last Nov 3Due Nov 10
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Arrival inspection dueLate
0arriving today
Arrival Tue Nov 3Due by Nov 1

Arrival check not done (was due Oct 29–Nov 1). Tap to start it.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 939,163 gal · 659 gal/day average, low 48, high 2,782 (30 days) · meter W50020

occupied vacant meter skipped days (use spread evenly)

Average day: 560 gal occupied (7 days) · 689 gal vacant (23 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

59 kWh 59 kWh on Nov 2 (range 59–81 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ Didn’t drop after departure Empty since Oct 12 (22 days) and still 67 kWh a day, 94% of the stay’s 72 kWh. AC or pool heater left on at checkout?
⚡ No setback when empty Last 30 days: empty days average 67 kWh, occupied days 72 kWh (94%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 72 kWh occupied (6 days) · 68 kWh vacant (24 days) · 14.9 kWh a day per 1,000 sq ft

4,600 sq ft · 5 AC units · Pool, heat pump (electric) · occupied 7 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Dec 4 Treated Sep 4, 2026 · next due Dec 4, 2026

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 4Due soon
16days left
Last Aug 21Next Nov 19
AC 1 - Main houseCurrent
77days left
Last Oct 21Next Jan 19
AC 2 - Main houseCurrent
31days left
Last Sep 5Next Dec 4
AC 3Current
81days left
Last Oct 25Next Jan 23
AC 5Current
58days left
Last Oct 2Next Dec 31

Open tickets 2 open in Limble

  • Kitchen GFCI keeps tripping. Reported during the weekly check. #800002 · reported by Keisha Thurston · opened Nov 2, 2026 (1 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

  • Kitchen GFCI keeps tripping. Reported during the weekly check. #800003 · reported by Keisha Thurston · opened Nov 1, 2026 (1 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design