PHM home
Delacroix Clean In house
“The Lookout”
PHM Jerome Seymour 25% of PHM On now, until 5pm HS Tech Darnell Ferguson On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 6,500 sq ft · 5 beds + guest house · lot SP-11 · 7 AC units · Pool, propane heater Occupied 15 of the last 30 days · 3 this month · 46 this year Limble: Delacroix - SP-11 Dedicated PHM
🔑 Request access from Jerome
Jerome gets it on My homes and as a phone alert. Times are optional.
Edit house name, vendors, size, pool and hot tub
Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector
Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.
Meter readings Read every week by the PHM All homes
Water Gallons a day from the Vision water consumption report, last 30 days
occupied vacant meter skipped days (use spread evenly)
Average day: 1,204 gal occupied (14 days) · 1,411 gal vacant (16 days)
Electric Daily kWh from Vision Metering, last 30 days Utility report
☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in
⚡ No setback when empty Last 30 days: empty days average 161 kWh, occupied days 166 kWh (98%). AC left at guest settings, or something running all the time?
occupied vacant
Average day: 165 kWh occupied (14 days) · 162 kWh vacant (16 days) · 25.2 kWh a day per 1,000 sq ft
6,500 sq ft · 7 AC units · Pool, propane heater · occupied 15 of the last 30 days
Pest control Quarterly treatment, included in the Home Care Program fees
- Thu Aug 20, 2026 marked by — · Quarterly treatment (Island Pest Services)
Updated from the vendor's pest control list.
HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.
Open tickets 0 open in Limble
🧰 Service calls vendor work
None in the last 60 days.
+ New service call 📊 Year's costs