← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 7 h ago Notices1 What's new Site map
Next ferry from Tamarind 22 min · 2:10 PMNext ferry from Seagrape 1 h 32 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Everett Clean

“Lazy Days”

Home state set by Danielle, 6 days ago

RS Rep Danielle Moss On now, until 5pm HS Tech Kevin Strachan On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 3,900 sq ft · 3 beds · lot SP-12 · 4 AC units · Pool, not heated Occupied 12 of the last 30 days · 0 this month · 49 this year Limble: Everett - SP-12

🔑 Request access from Danielle

Danielle gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly check
0days left
Last Oct 28Due Nov 3
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 863,675 gal · 801 gal/day average, low 41, high 2,772 (30 days) · meter W50028

occupied vacant meter skipped days (use spread evenly)

Average day: 841 gal occupied (12 days) · 775 gal vacant (18 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

49 kWh 49 kWh on Nov 2 (range 34–134 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ Didn’t drop after departure Empty since Oct 30 (4 days) and still 40 kWh a day, 90% of the stay’s 45 kWh. AC or pool heater left on at checkout?
⚡ No setback when empty Last 30 days: empty days average 66 kWh, occupied days 43 kWh (153%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 43 kWh occupied (12 days) · 65 kWh vacant (18 days) · 14.4 kWh a day per 1,000 sq ft

3,900 sq ft · 4 AC units · Pool, not heated · occupied 12 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Due Nov 17 Due Nov 17, 2026 (in 14 days) · last treated Aug 17, 2026

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 2 - Main houseDue soon
6days left
Last Aug 11Next Nov 9
AC 1 - Main houseCurrent
74days left
Last Oct 18Next Jan 16
AC 3Current
36days left
Last Sep 10Next Dec 9
AC 4Current
54days left
Last Sep 28Next Dec 27

Open tickets 2 open in Limble

  • Front door lock stiff. Reported during the weekly check. #800017 · reported by Danielle Moss · opened Oct 20, 2026 (14 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

  • Hurricane shutter track sticking. Reported during the weekly check. #800090 · reported by Danielle Moss · opened Aug 22, 2026 (73 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design