← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 8 h ago Notices1 What's new Site map
Next ferry from Tamarind 1 h 17 min · 4:30 PMNext ferry from Seagrape 7 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Rutherford Clean In house

“Morning Glory”

Home state set by Keisha, 5 days ago

RS Rep Keisha Thurston Off today (Off) HS Tech Rohan Gibson On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 5,000 sq ft · 4 beds + guest house · lot FE-8 · 6 AC units · Pool, heat pump (electric) Occupied 19 of the last 30 days · 3 this month · 49 this year Limble: Rutherford - FE-8

🔑 Request access from Keisha

Keisha gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly check
1day left
Last Oct 29Due Nov 4
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 1,030,497 gal · 1,192 gal/day average, low 384, high 3,372 (30 days) · meter W50038

occupied vacant meter skipped days (use spread evenly)

Average day: 1,137 gal occupied (18 days) · 1,274 gal vacant (12 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

115 kWh 115 kWh on Nov 2 (range 69–189 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ No setback when empty Last 30 days: empty days average 145 kWh, occupied days 152 kWh (95%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 152 kWh occupied (18 days) · 146 kWh vacant (12 days) · 29.9 kWh a day per 1,000 sq ft

5,000 sq ft · 6 AC units · Pool, heat pump (electric) · occupied 19 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Jan 29 Treated Oct 29, 2026 · next due Jan 29, 2027

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 1 - Main houseOverdue
5days overdue
Last Jul 31Next Oct 29
AC 6Due soon
16days left
Last Aug 21Next Nov 19
AC 2 - Main houseCurrent
75days left
Last Oct 19Next Jan 17
AC 3Current
51days left
Last Sep 25Next Dec 24
AC 4Current
37days left
Last Sep 11Next Dec 10
AC 5Current
38days left
Last Sep 12Next Dec 11

Open tickets 1 open in Limble

  • Pool light out. Reported during the weekly check. #800064 · reported by Keisha Thurston · opened Sep 12, 2026 (52 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design