← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 8 h ago Notices1 What's new Site map
Next ferry from Tamarind 1 h 18 min · 4:30 PMNext ferry from Seagrape 8 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Calloway Clean

“Driftwood”

Home state set by Keisha, 5 days ago

RS Rep Keisha Thurston Off today (Off) HS Tech Rohan Gibson On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 5,100 sq ft · 4 beds + guest house · lot SS-3 · 6 AC units · Pool, propane heater Occupied 16 of the last 30 days · 0 this month · 37 this year Limble: Calloway - SS-3

🔑 Request access from Keisha

Keisha gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly check
1day left
Last Oct 29Due Nov 4
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 905,082 gal · 688 gal/day average, low 87, high 2,962 (30 days) · meter W50003

occupied vacant meter skipped days (use spread evenly)

Average day: 776 gal occupied (17 days) · 572 gal vacant (13 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

53 kWh 53 kWh on Nov 2 (range 44–172 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ No setback when empty Last 30 days: empty days average 85 kWh, occupied days 80 kWh (107%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 74 kWh occupied (16 days) · 90 kWh vacant (14 days) · 16.0 kWh a day per 1,000 sq ft

5,100 sq ft · 6 AC units · Pool, propane heater · occupied 16 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Jan 13 Treated Oct 13, 2026 · next due Jan 13, 2027

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 1 - Main houseDue soon
24days left
Last Aug 29Next Nov 27
AC 3Due soon
17days left
Last Aug 22Next Nov 20
AC 2 - Main houseCurrent
46days left
Last Sep 20Next Dec 19
AC 4Current
74days left
Last Oct 18Next Jan 16
AC 5Current
47days left
Last Sep 21Next Dec 20
AC 6Current
49days left
Last Sep 23Next Dec 22

Open tickets 1 open in Limble

  • Garage door sensor out of line. Reported during the weekly check. #800007 · reported by Keisha Thurston · opened Oct 30, 2026 (4 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design