← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 8 h ago Notices1 What's new Site map
Next ferry from Tamarind 1 h 16 min · 4:30 PMNext ferry from Seagrape 6 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Hollister Clean

“Calypso”

Home state set by Andre, 4 days ago

RS Rep Andre Whitfield Off today (Off) HS Tech Terrence McKenzie On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 3,200 sq ft · 3 beds · lot HV-7 · 4 AC units · No pool Occupied 3 of the last 30 days · 1 this month · 12 this year Limble: Hollister - HV-7

🔑 Request access from Andre

Andre gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly checkCurrent
2days left
Last Oct 30Due Nov 5
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 463,149 gal · 317 gal/day average, low 47, high 569 (30 days) · meter W50049

occupied vacant meter skipped days (use spread evenly)

Average day: 247 gal occupied (3 days) · 325 gal vacant (27 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

37 kWh 37 kWh on Nov 2 (range 28–110 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ No setback when empty Last 30 days: empty days average 72 kWh, occupied days 60 kWh (120%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 68 kWh occupied (3 days) · 71 kWh vacant (27 days) · 22.0 kWh a day per 1,000 sq ft

3,200 sq ft · 4 AC units · No pool · occupied 3 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Jan 11 Treated Oct 11, 2026 · next due Jan 11, 2027

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 1 - Main houseCurrent
50days left
Last Sep 24Next Dec 23
AC 2 - Main houseCurrent
78days left
Last Oct 22Next Jan 20
AC 3Current
60days left
Last Oct 4Next Jan 2
AC 4Current
62days left
Last Oct 6Next Jan 4

Open tickets 0 open in Limble

No open tickets for this home.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design