← Exit demo · back to WellkeptTamarind Point demo · a made-up club · nothing can be changedSee it as:Admin
Limble synced 7 h ago Notices1 What's new Site map
Next ferry from Tamarind 22 min · 2:10 PMNext ferry from Seagrape 1 h 32 min · 3:20 PM
📌 New notice for you: Storm season: secure the outdoor furnitureRead
← Homes in Program

program home

Ingram Clean

“Windward”

Home state set by Danielle, 5 days ago

RS Rep Danielle Moss On now, until 5pm HS Tech Rohan Gibson On now, until 3:30pm HVAC team Unassigned Landscaping Not set Pool / hot tub Not set Size 6,800 sq ft · 5 beds + guest house · lot SS-9 · 7 AC units · Pool, propane heater Occupied 6 of the last 30 days · 0 this month · 20 this year Limble: Ingram - SS-9

🔑 Request access from Danielle

Danielle gets it on My homes and as a phone alert. Times are optional.

Edit house name, vendors, size, pool and hot tub

Inspections Weekly check and pre-arrival check here; the monthly inspection is done in Happy Inspector

Weekly check
1day left
Last Oct 29Due Nov 4
Monthly inspectionHappy Inspector
—

Done in Happy Inspector by RS and the PHMs. Results will show here once Happy Inspector is connected.

Water Gallons a day from the Vision water consumption report, last 30 days

Reporting Last reported Mon Nov 2, 9:28pm · reading 921,485 gal · 590 gal/day average, low 72, high 2,608 (30 days) · meter W50009

occupied vacant meter skipped days (use spread evenly)

Average day: 939 gal occupied (6 days) · 503 gal vacant (24 days)

📈 See more history

Electric Daily kWh from Vision Metering, last 30 days Utility report

82 kWh 82 kWh on Nov 2 (range 57–94 kWh)

☀ Weather Nov 2: High 89°F · low 76°F · humidity 81% · rain 0.40 in

⚡ Didn’t drop after departure Empty since Oct 19 (15 days) and still 75 kWh a day, 94% of the stay’s 80 kWh. AC or pool heater left on at checkout?
⚡ No setback when empty Last 30 days: empty days average 73 kWh, occupied days 80 kWh (91%). AC left at guest settings, or something running all the time?

occupied vacant

Average day: 80 kWh occupied (6 days) · 73 kWh vacant (24 days) · 11.0 kWh a day per 1,000 sq ft

6,800 sq ft · 7 AC units · Pool, propane heater · occupied 6 of the last 30 days

📈 See more history

Pest control Quarterly treatment, included in the Home Care Program fees

Next Dec 28 Treated Sep 28, 2026 · next due Dec 28, 2026

Updated from the vendor's pest control list.

HVAC service Quarterly service per AC unit, from Limble. History starts Apr 17, 2026.

AC 3Due soon
29days left
Last Sep 3Next Dec 2
AC 1 - Main houseCurrent
37days left
Last Sep 11Next Dec 10
AC 2 - Main houseCurrent
67days left
Last Oct 11Next Jan 9
AC 4Current
39days left
Last Sep 13Next Dec 12
AC 5Current
48days left
Last Sep 22Next Dec 21
AC 6Current
68days left
Last Oct 12Next Jan 10
AC 7Current
76days left
Last Oct 20Next Jan 18

Open tickets 1 open in Limble

  • Hurricane shutter track sticking. Reported during the weekly check. #800004 · reported by Danielle Moss · opened Oct 31, 2026 (3 days)
    Contractor / parts / project
    ✓ Close this ticket
    🔁 Handed off to a 3rd-party contractor? Don't close it: keep it open and follow it up

    Not finished: a contractor is doing the work. The ticket stays open and you and the Rep / tech follow it up until it's done, then close it.

🧰 Service calls vendor work

None in the last 60 days.

+ New service call 📊 Year's costs
Site designed by LuxAbaco Design